From removing an internal wall to laying wooden flooring, changes to a leasehold flat can require a licence for alterations. Our guide covers how to apply, what costs to expect, and how to seek retrospective consent for work already completed.
Leasehold flat renovation with exposed brickwork and temporary supports

Making changes to a leasehold property often involves more than instructing a contractor. Many leases require the landlord’s formal consent before works are carried out, usually documented in a licence for alterations. Overlooking that step can create risk, delay a sale, or lead to costly disputes. Perhaps more worryingly, carrying out works without a landlord’s consent, if the lease requires it, constitutes a breach of lease with serious consequences.

Leaseholders regularly encounter issues when works have already been completed without consent, particularly when a property is being sold or refinanced. Addressing those issues early and understanding the process can make a significant difference to timing and cost.

Our leasehold advisory solicitors work closely with leaseholders, managing agents, and surveyors to keep matters moving and avoid unnecessary friction.

If you’re planning works or dealing with historic alterations, contact our solicitors for advice on obtaining consent and avoiding delays.

What is a licence for alterations?

A licence for alterations is a formal written consent from the landlord allowing a leaseholder to carry out works to a property. The requirement for consent comes from the lease itself, which sets out what can and cannot be done without approval.

Most leases distinguish between different types of works. Structural alterations are almost always prohibited without consent, while internal, non-structural changes may still require approval, depending on the lease’s wording. Establishing whether or not the works carried out are structural may require the input of a surveyor or contractor who can advise.

A key point often missed is that a licence for alterations is personal to the leaseholder who carried out the works and limited only to the specified works detailed in the licence. It is not simply a general approval for the property, which is why it becomes so important during a sale or remortgage.

When is a licence required?

The starting point is always the lease. Assumptions about what is minor or internal can be misleading.

A licence is commonly required for:

  • Removing or altering walls, even if they are not load-bearing.
  • Changing the layout of the property.
  • Installing or relocating kitchens or bathrooms.
  • Altering plumbing, drainage, or electrical systems.
  • Installing new flooring where restrictions apply, such as wooden floors in flats.

Even where works appear cosmetic, the lease may still require consent. Failing to check at the outset is one of the most common causes of problems later.

What are typical alterations in leasehold property?

Alterations covered by a licence can range from minor internal changes to more significant works. What requires consent will always depend on the lease, but common examples include:

  • Removing internal walls or opening up rooms.
  • Reconfiguring layouts, such as creating open-plan living spaces.
  • Installing or relocating kitchens and bathrooms.
  • Upgrading plumbing, drainage or electrical systems.
  • Replacing flooring, particularly where leases restrict hard flooring like wood or tiles.
  • Installing new windows or altering existing ones.
  • Adding recessed lighting or cutting into ceilings.

Even relatively modest changes can fall within the scope of the lease. Where in doubt, it is always safer to check before works begin rather than deal with the consequences later.

Carrying out works without consent

Undertaking alterations without a required licence places the leaseholder in breach of the lease.

In practice, that can lead to:

  • The landlord requiring retrospective consent, often on stricter terms.
  • Legal and surveyor costs being passed to the leaseholder.
  • Delays when selling or remortgaging the property.
  • In more serious cases, enforcement action, or demands for reinstatement if the works have been carried out in breach of the lease provisions.

Issues often come to light during conveyancing, when the buyer’s solicitor raises enquiries about alterations. At that stage, time pressure can make the situation more difficult and more expensive to resolve.

What is a retrospective licence for alterations?

A retrospective licence is consent granted after works have already been completed. These are commonly required where alterations were carried out without approval, sometimes many years earlier.

Landlords are not obliged to grant retrospective consent. Where they do, it is usually subject to conditions, which may include:

  • A surveyor’s report confirming the works are satisfactory.
  • Payment of the landlord’s legal and professional fees.
  • Additional obligations, such as reinstatement provisions or ongoing compliance requirements.

Retrospective applications can take longer than standard applications, particularly if documentation is missing, or the works are extensive. Starting the process early, especially ahead of a sale, can prevent avoidable delays and give you more control over the outcome.

How to obtain a licence for alterations

The process typically begins with a formal application to the landlord or managing agent.

Leaseholders are usually required to provide:

  • Detailed plans and specifications of the proposed works.
  • Information about contractors.
  • Structural calculations, or surveyor input, where relevant.

The landlord will often instruct their own surveyor and solicitor to review the proposal. Their reasonable costs are normally payable by the leaseholder.

Timescales vary, but delays are common where information is incomplete, or where multiple parties are involved. Clear, well-prepared applications tend to progress more smoothly, and reduce the risk of further queries.

What does a licence for alterations cost?

Costs vary depending on the nature of the works and the landlord’s requirements, but leaseholders should expect to cover more than just their own legal fees.

Typical costs can include:

  • The landlord’s legal fees.
  • The landlord’s surveyor or engineer fees.
  • Your own legal and professional costs.

For retrospective licences, costs are often higher, particularly where additional reports or investigations are required. Budgeting early and understanding likely costs helps avoid delays later in the process.

Common issues and delays

Licence applications can stall for a number of reasons:

  • Incomplete or unclear plans.
  • Disagreement over whether consent is required.
  • Slow responses from landlords or managing agents.
  • Additional conditions being imposed late in the process.

Where a transaction is underway, these delays can become critical. Early engagement and a clear strategy can make a material difference.

Do you also need planning permission, building regulations or party wall consent?

Landlord consent under a lease is separate from planning permission, building regulations and party wall matters. Leaseholders may need to deal with one, some or all of these depending on the works.

Our role focuses on the leasehold consent process and protecting your position under the lease. Planning, building control and party wall matters sit within separate regimes and should be addressed separately where required.

Guidance from our leasehold solicitors

Licence for alterations issues are a routine part of leasehold ownership, but they are often overlooked until they become urgent. Whether you are planning works or dealing with historic alterations, getting the right advice early can prevent delay, reduce cost, and avoid unnecessary disputes.

Jennifer Slater, head of leasehold advisory and enfranchisement, says:

“Licence for alterations issues are one of the most common causes of delay we see in leasehold transactions. Addressing consent at the right time and making sure the documentation is in order can avoid unnecessary costs and keep matters on track.”

Expert legal advice at an early stage can help you deal with licences efficiently, whether you are planning works or resolving historic issues. Get in touch to speak with our leasehold advisory solicitors.